when using the pc-7 for bedding the reciever on my savage 110 i used 1/4"x28 all thread studs wrap with tape and i believe the tape got hung up inside the pillar not letting the reciever seat fully in the stock, the front pillar on my savage 110 is about 1/8" below the pc-7 bedding. do i need to dremel the bedding down to it reaches the top of the pillar and redo?