I got the gauges in yesterday and set the head spacing. I was actually a little tight on my mock up on the factory load. I could cycle factory loads but neither the go or no go would even budge. This was my fist time setting head spacing and the PTG gauges gave me a soild feel of closing or not closing. I did have both the extraxtor and plunger removed.

i am awaiting some more parts from clintsrv, to work on basically turning it in to a short action center feed. Thanks Clintsrv for the out of the box thinking! I also need to get everything together to pillar and glass bed the stock. I can just tell by the way it goes on that it is not a very soild connection, and I want to bed the action before I take it to the range so I am not disappointed.

Going to be pretty busy most of the week so I hope to get back on it Saturday and Sunday.