Quote Originally Posted by nuclabuyer
I would drill the holes a little over size for the new pillars. Then put the pillars onto the action like normal pillar bedding. Then when you remove the screws after the bedding material is dry, as long as the action was centered, the pillars should be straight.
I think I will try this. Thanks for the input guys.