been playing with the lathe to get some more time on it and thought i'd show my latest creation. I remember seeing the 38/357 ball bearing bolt lift mod a long while ago so I thought i'd take it to the next level. I decided to machine the BAS down and center drilled it to put a second ball bearing. I even made sure that the whole assembly mic'd out to the same total installed length (in my case my BAS was .8835 long) from the bottom of the rim to the top of the BAS it's back at .8835 so no worries about changing the preload on the firing pin spring. Feels much better now!
Bookmarks